Home
Please read these instructions carefully before you
Contents
1. button 8 Program then button 4 Temperature and set the temperature by using buttons 6 and 7 Plus Minus followed by pressing button 9 Memory twice The timer is programmed by pressing button 8 Program then button 5 Timer and set the time by using buttons 6 and 7 Plus Minus followed by pressing button 9 Memory twice You can now start the steam bath by pressing once button 2 Steam On Off ADVICE When you begin using the steam cabin do not start with periods of longer that 10 to 12 minutes at a temperature of 35 C After several steam baths at these levels and whilst feeling well you may safely increase the temperature with increments of 5 C and of 5 minutes per 2 to 3 usages The maximum safe temperature of a steam bath is 50 C You can place herbal essences or therapeutic oils into the top of the steam outlet to create a particular steam aroma fitting to your mood Radio To control your FM radio start by pressing button 11 Radio On Off With button 10 Frequency your radio will go back to the last station you listened to You can now use buttons 6 and 7 Plus Minus to auto search forward or backward Press button 9 Memory twice to confirm Light Just press button 3 Light On Off to switch the halogen lamp on or off Page 8 of 9 Manual for preparation installation w operation and maintenance of a S ANINOVA Malibu or California steam cabin YMAAX UK amp Eire delivered mo
2. of that you can listen to the radio and switch on the light if required 2 Steam On Off 3 Light On Off 11 Radio On Off 10 Frequency 4 Temperature 8 Program k 6 7 Plus Minus 5 Timer The displ 1 Alarm A An acoustic signal will sound when the water level in the steam generator is too low While filling it will sound at intervals and stop when the level is back to normal B An acoustic signal will sound when the desired temperature level has been reached It will continue until switched off C Furthermore the button can be used for giving a distress signal Steam On Off Switching steam on or off Light On Off Switching halogen lamp on or off Temperature This button is used to start setting the steam temperature Timer This button is used to start setting the steam timer Minus Decrease time temperature or radio frequency Plus Increase time temperature or radio frequency Program This button is used to initiate programming a steam bath Memory This button when pressed twice will confirm any programming actions 10 Frequency With this button you can initiate auto search of frequencies 11 Radio On Off Switching the radio on or off OONHIRWYD Page 7 of 9 Manual for preparation installation S operation and maintenance of a S ANINOVA Malibu or California steam cabin YMAAX UK amp Eire delivered model Steam To program the temperature of your steam bath press
3. outer face corners of the back wall with the outer corners of the tray Fix with C clamps and drill down through the holes in the back wall into the tray using an 8 mm HSS drill steel and bolt together Step 4 Fit the steam outlet pipe this is the 22mm os Ge hose under the tray from the steam generator to the back wall fitting It has to pass through the 2nd large hole on the right hand side of the 3 back wall view back wall from the rear If it is necessary to enlarge the hole when the pipe is tight fitting do this using a round or half round metal file Secure pipe to steam outlet using large pipe clip provided Step 5 E s Fit the steam generator water inlet pipe this i is the 17mm black rubber hose under the tray It passes through the 1st hole in the rear right hand side of the back wall viewed from rear It will be necessary to push the control clipped to the tray support leg out of the way to gain better access to the hole Pass pipe to water valve and tighten pipe clip Step 6 Fit the temperature sensor the grey wire with a black end by passing the wire through the same hole as the steam generator water inlet pipe and pushing it into the temperature sensor housing It may be necessary to gently squeeze the wire to a round ae shape if difficulty is found in fitting into housing but do not squeeze the grey tip as this will break the insulation Step 7 Fit the water control valve wires these ar
4. the joints of the tray and back wall canopy and back wall When sealing off the cubicle ensure all surfaces are clean and dry Page 5 of 9 Manual for preparation installation _ operation and maintenance of a S ANINOVA Malibu or California steam cabin BYVIAAX UK amp Eire delivered model Operation Shower model California The shower is very simple to operate Turn the lever to the left pull back and the water will flow out of the handset turn to the right and water will flow out of the body jets the 2 can be mixed by moving the lever between left and right to suit personal taste To control the water temperature turn the control knob underneath the lever to the desired temperature and the valve will maintain that temperature as long as there are no large pressure drops or shortage of hot water To go past 38 C turn the thermostatic valve as far as it will go then push in the safety button and continue to turn the control knob Steam model California When you want to enjoy a relaxing steam bath press the on off button on the round control panel to the right of the mixer valve A green LED will indicate when steam is being generated A blinking green LED indicates the generator is in the process of shutting off after which it will flush itself with cold water see also the chapter Maintenance A red LED indicates if the steam generator is heating up or filling up with fresh water See also picture Shoul
5. E WAVE Page 9 of 9
6. Manual for preparation installation _ operation and maintenance of a S ANINOVA Malibu or California steam cabin BYVIAAX UK amp Eire delivered model Please read these instructions carefully before you begin assembly installation Malibu steam cabin California steam cabin Introduction Dear customer First of all we would like to congratulate you with the purchase of this MAAX SaniNova quality product Before you lies the manual for assembly installation and use of your SaniNova by MAAX steam cabin Both currently available models Malibu and California are described in this manual Please read the manual carefully before you begin with and during the installation The differences per model are clearly indicated by means of an M where relevant indicating that this part instruction or feature is connected with the Malibu steam cabin All other parts instructions or feature adhere to both California and Malibu Page 1 of 9 Manual for preparation installation __ operation and maintenance of a S ANINOVA Malibu or California steam cabin YMAAX UK amp Eire delivered model Part list 1 Back wall with pre formed seat and ledge for shampoo etc Holes for all parts are pre drilled 2 Shower tray with adjustable feet underneath which the steam generator and electronic junction box are mounted The hole for the drainpipe has been pre drilled Inspection panel for the bottom tray Canopy Holes fo
7. d the red LED start to blink the steam generator has failed to fill up properly and has shut itself down for safety reasons Green LED Red LED After a few minutes the beneficial steam will flow from the outlet at the lower left corner Beware possibility of hot drops forming at the underside of the steam outlet SUGGESTION You can place herbal essences or therapeutic oils into the top of the steam outlet to create a particular steam aroma befitting your mood Page 6 of 9 Manual for preparation installation _ operation and maintenance of a S ANINOVA Malibu or California steam cabin ByYVIAAX UK amp Eire delivered model Shower model Malibu The various options for showering are very simple to operate By turning the function selection knob you can direct the water flow via one of the options These options are shower head 6 side jets 6 back jets or 3 shoulder jets Water will always flow at full force To control the water temperature turn the control knob underneath the lever to the desired temperature and the valve will maintain that temperature as long as there are no large pressure drops or shortage of hot water To go past 38 C turn the thermostatic valve as far as it will go then push in the safety button and continue to turn the control knob Steam and other features Malibu The Malibu steam cabin will allow you to experience a luxurious steam bath fully programmed to your personal taste On top
8. del Maintenance Acrylic products are very easy to clean and maintain because hardly any dirt remains behind on the surface A sponge or soft cloth and possibly a few drops of an anti static preparation will be sufficient for routine cleaning This will make your cabinet fresh and shining again and you will renew the dirt repellent properties You can use domestic liquid detergent for example washing up liquid to remove obstinate dirt Never use any abrasive gritty cleaning or scouring materials After each steam bath the steam generator starts its self cleaning process This process consists of a rapid in flow of cold water to shock the system and prevent limescale from depositing on the insides of the steam generator Self cleaning drainage will occur through the steam inlet Specifications Dimensions WxHxD 0 9x2 18x0 9 Mtr Weight 90 Kg Minimum water pressure needed 85 000 Btu 2 0 Bar Flow rate Depends on input and choice of jets shower head Steam generator 2 8 kW 220 240 Volt 16 amp required Control operation By touch button panel Hot and cold inlets 15 mm pipe size Water valves 12v DC Water connection 40 mm universal compression fitting required with flexible waste pipe Thermostatic mixer valve 5 Bar max pressure Temperature sensor Set at 55 C Contact Should you require assistance you can contact our After Sales Service at 44 0 1452 721440 ae A A a gt a n ANR a ies Ahead or TH
9. e the 2 spade terminal connectors Pass these wires through the same hole as the temperature sensor and push fit terminals onto water valve it does not matter which way round wires connect to water valve Page 3 of 9 Manual for preparation installation __ operation and maintenance of a S ANINOVA Malibu or California steam cabin ByYVIAAX UK amp Eire delivered model Step 8 Disconnect the touch pad electronic switch pad from the wire which is fitted to the control box Run this wire also through the same hole as the temperature sensor Fit the touch pad in the rear panel and re connect the wire Step 9 Fit the shower handset riser rail Assemble the support brackets onto the riser tube hold assembled riser rail against recess in the back wall Mark the 2 holes that will secure the rail to the wall drill the 2 marks with a 3mm drill then screw the riser rail assembly to the back wall using the 2 self tapping screws provided Step 10 A To start with the assembly of the shower doors you should check the position of the screws in the guides of the sliding door The head of the screw should not protrude outside the guide Adjust if needed See figure 1 Step 10 B Place one of the curved rails on the floor with the open side facing up Press the door which will remain static without handle into the rail until you hear a click By positioning the Static door on the far right hand or far left hand side in the ra
10. il you will determine on which side the entrance to the cabin will be Now you can press the other rail onto the top of the static door See figure 2 Step 10 C Now slide the sliding door by way of its guides into the rails from the opposite side of the static door Slide in with the handle on the outside See figure 3 Step 10 D Click the separate standing profile between the ends of the curved rails in such a manner that the closed side of the profile is facing the sliding door See figure 4 Step 10 E Place the wall profiles to the back wall of the cabin 1 cm from the side of the cabin Copy the pre drilled holes onto the back wall and drill 3 mm holes at these positions Screw the wall profiles onto the back wall with the short end facing outwards using the screws as included See figure 5 Page 4 of 9 Manual for preparation installation __ operation and maintenance of a S ANINOVA Malibu or California steam cabin BYVIAAX UK amp Eire delivered model Step 10 F Place the door assembly in the wall profiles Fix it to the wall profiles by drilling through the pre drilled holes and by placing the plastic pop rivets See figure 6 Step 10 G Saw the 2 pieces of covering profile to size and click into both rails See figure 7 Step 10 H Adjust the sliding door with the screws in the top guides in such a manner that the sliding door is in line with the fixed door and that the handle is pa
11. r the speaker and Halogen light are pre drilled M Chrome shower set including shower riser rail and shower head with hose Set of shower doors Assembly box including all small parts necessary Article code Description Qty Remarks _ X9070 Pipe clip 12 20 mm 1 X9071 Pipe clip 20 32mm fT X9187_ __ Bolt M6x40 mm M4 S Xx9188 ___ NutM6e M Co i Malibuonly ee E g X9003 Washer M6 X9729 Halogen lamp Malibu only Malibu only Preparation Clear the location where the steam cabin is to be placed of all furniture or other objects that might hamper organised installation Remove all parts from their packaging and check to make sure they are in good condition Do not begin installation if this is not the case The guarantee does not cover damage once the steam cabin has been installed Check whether the floor is level and solid enough to support the weight of the unit and its occupant s when in use Make sure the wall against which the steam cabin is to be placed are at a right angle Ensure that all connections to water and electrical supplies are performed by a registered firm Any technical changes to the product or any inadequate connections of water and electricity will nullify all guarantee provisions The electrical connection is in the fitted appliance inlet box Only an official registered electrical installations firm may make the connection The regulations of the local energy Supply company mu
12. rallel to the wall profile See figure 1 Step 10 l Slightly lubricate both rails using vaseline Step 10 J Seal the seams between the cabin and the wall profiles using silicone kit Now you position and bolt the canopy to the back wall using the 6mm x 50mm bolts provided Step 11 Connect hot and cold supply to the thermostatic mixer valve using ae pipe Slee steel braided or 15mm PVC pipe ensuring pipe work has been S amp T RAES flushed out first Connect the waste pipe using 40mm flexible waste pipe Make sure the pipe runs lower than the tee fitting in the waste system otherwise the steam generator cannot empty thereby preventing self cleaning from working properly Connect the electrical supply to the control box using a 16amp supply Fit the chrome face plate to the thermostatic valve seal off around the face plate with silicone kit to the back wall amp fit chrome lever to mixer valve with the lever facing upwards This allows easy access to the 2 5 mm Allen screw which when screwed in will align with the indentation in the square spindle You should now check for any leaks in the pipe work before final fitting Step 12 Seal off the cubicle by running a bead of silicone sealant around the outside of the wall profiles and the guide rails top and bottom ensuring that the thickness of the silicone is approx 5mm thick to allow for movement during temperature changes Also run a bead of silicone sealant between
13. st be strictly observed as must the provisions of DIN57100 part 701 and VDE 0100 part 701 The supply must pas through an RCD residual current detector with 1_n 30 mA and be protected by a 16A fuse 2 5 mm 3500W max The nominal load of the cubicle is 2800W A multi pole switch with a gap between contacts when open of at least 3 mm shall be provided to isolate the power circuit The RCD at least 4 mm must be connected to the place reserved for it shown by PE labels Page 2 of 9 Manual for preparation installation S operation and maintenance of a S ANINOVA Malibu or California steam cabin B YVIAAX UK amp Eire delivered model Installation Tools and materials needed Adjustable spanner Kit gun Power drill Silicone kit Steel drill 8mm HSS Metal file half round Screwdriver 2 5 mm Allen key Metal saw Phillips screwdriver Vaseline Step 1 Place the tray in the area where the cubicle is to be fitted and adjust the feet to level the tray Step 2 Place the canopy on top of the back wall Align the corners making sure the canopy fits flush with outside face of the back wall Fix with C clamps and drill up through the holes in the back wall into the canopy using an 8 mm HSS drill steel Important wait with fitting the canopy until you have assembled and fitted the shower doors Step 3 Stand tray on the floor Apply silicone kit to the rear edge lift and place back wall onto tray align the
Download Pdf Manuals
Related Search
Related Contents
Guía Rapida de Instalación WebNCTS User Manual User`s Manual Télécharger GE DDC4580B User's Manual Tecnoware FGCEVODS06MM/12 uninterruptible power supply (UPS) 取扱説明書 - ソフトマティック combi 740 - forum Électricité Mode d`emploi - Rotronic Shop Samsung RT43SA 極簡雙門系列 Copyright © All rights reserved.
Failed to retrieve file